Hospital plant room with air-handling units, a monitoring screen and backup generators
Representative scenario

Monitoring critical systems across a private hospital

A private hospital’s critical plant is monitored by half a dozen separate panels, and some alarms only sound in rooms nobody is in. This is how we’d bring them into one building automation and alarm system.

Sector
Healthcare
Setting
200-bed private hospital with 8 theatres
Illustrative scale
Around 4,000 data points
Core hardware
Plant-room PLCs, gateways for existing panels, redundant SCADA, alarm escalation
Protocols
Modbus TCP/RTU, BACnet/IP, dry-contact alarms
Typical programme
6–9 months, phased around theatre schedules

The challenge

Theatre air handling, chillers, generators, UPS units, medical-gas alarm panels, cold rooms and pharmacy fridges each have their own controller or alarm panel. Several only alarm locally, in plant rooms that are empty most of the night.

During load-shedding the generators and UPS units carry theatres and ICU, but confirming that every changeover worked means walking the building. A failed cold room or vaccine fridge may only be found the next morning.

Accreditation audits ask for temperature, humidity and pressure records for theatres and cold storage. Today those come from paper logs and separate data loggers.

Our approach

  1. Critical systems register

    With the engineering and infection-control teams, we list every system whose failure affects patients, what normal looks like, and who must be told when it isn’t.

  2. Connect what exists

    Existing controllers and alarm panels are read through gateways or their alarm contacts, so nothing clinical is replaced or reconfigured. New sensors fill the gaps, such as theatre pressure and cold-room temperature.

  3. One alarm system

    All alarms land in one redundant SCADA system with priorities. Critical alarms escalate by SMS and phone call to the technician on duty, then to a supervisor if nobody acknowledges them within minutes.

  4. Records for audit

    Theatre temperature, humidity and pressure, cold-room temperatures and every generator and UPS changeover are logged automatically and reported monthly for accreditation.

System architecture

How the layers connect, from the people using the system down to the equipment in the field.

People
  • Technicians on duty (SMS and call)
  • Engineering manager
  • Infection control (audit reports)
SCADA
  • Redundant SCADA servers
  • Prioritised alarm list
  • Audit reports
Communications
  • Dedicated OT network, separate from clinical IT
Control
  • PLCs per plant room
  • Gateways for existing BMS and alarm panels
Equipment
  • Theatre AHUs and pressure
  • Generators and UPS
  • Medical-gas alarm panels
  • Cold rooms and fridges

What we’d deploy

Target outcomes

One list
Every critical alarm, prioritised, in one place
Minutes
Before an unacknowledged alarm escalates
Every start
Generator and UPS changeovers confirmed and logged
Audit-ready
Theatre and cold-storage records kept automatically

Targets we would design and report against, not measured results from a named client. Actual results depend on the baseline established in the audit.

Common Questions

Questions about
this kind of project.

Does this replace our existing BMS or medical-gas alarms?

No. Existing systems keep doing their jobs, including any alarms required by regulation. We read their outputs so everything is visible and escalated from one place.

Is the monitoring network connected to clinical systems?

No. It runs on a separate OT network, segmented from clinical and administrative IT, with controlled and logged remote access.

How is it installed without disrupting theatres?

Work is scheduled around theatre lists with the hospital’s engineering team, and anything inside a theatre is done during planned downtime.

Keep Reading

More case studies.

All case studies
Get Started

Let’s build Africa’s
smart future together.

Rising energy costs, water scarcity, and tightening ESG mandates demand a partner who has solved these challenges before.