About Services
Smart Energy Smart Water & IoT Building Automation Security & Assets Connectivity Cybersecurity Data & AI
Why CPS Case Studies FAQ Contact Us
Orange industrial robotic arms handling metal components on an automated manufacturing line
Representative scenario

Connecting production equipment for better plant visibility

When production data is spread across machine panels, spreadsheets and operator notes, it is difficult to understand recurring stoppages or compare shifts consistently. This representative case study shows how CPS could integrate available plant data into a practical monitoring and reporting workflow.

Sector
Manufacturing and industrial processing
Setting
Production line with supporting utilities
Illustrative scope
One line or production cell pilot
Core hardware
PLCs, industrial gateways, HMI and SCADA
Protocols
Modbus TCP, OPC UA and supported PLC protocols
Delivery approach
Baseline, pilot, validation and staged expansion

The challenge

Production teams may know when a line has stopped but lack a consistent record of the reason, duration and affected equipment. Data from PLCs, operator logs and maintenance records is often disconnected, limiting the usefulness of shift and weekly reports.

Maintenance teams also need to distinguish process-related stoppages from machine faults, utility interruptions or communications issues. A large-scale controls replacement would add risk and cost before the underlying problem is understood.

The goal is to create a reliable baseline from available production and machine data, make downtime events easier to review and provide maintenance and operations teams with actionable trends.

Our approach

  1. Map the production process

    Work with operators and engineering staff to map the line, identify critical assets and agree on useful measures such as run state, cycle counts, fault states and utility consumption.

  2. Integrate existing signals

    Read appropriate PLC, SCADA and meter data through supported protocols or edge gateways. Avoid changing machine control logic unless separately engineered and authorised.

  3. Build operational dashboards

    Present line state, alarm history, downtime categories and energy trends in dashboards that match the plant’s operating rhythm and reporting needs.

  4. Review the baseline

    Validate event definitions with operators, compare dashboard data with shift records and establish improvement targets only after a dependable baseline exists.

System architecture

How the layers connect, from the people using the system down to the equipment in the field.

Users
  • Production supervisors
  • Maintenance planners
  • Plant engineering and management
Analytics and reporting
  • Shift and daily production summaries
  • Downtime categories and event timelines
  • Energy trends per line or asset where metered
Data platform
  • SCADA historian or approved data store
  • Dashboards and scheduled reports
  • Controlled data export to business systems
Industrial integration
  • Edge gateway
  • OPC UA or Modbus interfaces
  • Segmentation between OT and IT
Shop floor
  • Existing PLCs and HMIs
  • Machine status and fault signals
  • Power and utility meters where available

What we’d deploy

Target outcomes

Visible
Consistent production and equipment status
Traceable
Downtime events reviewed against operator context
Comparable
Shift and line reporting based on agreed definitions
Target-led
Improvement measures set after baseline validation

Targets we would design and report against, not measured results from a named client. Actual results depend on the baseline established in the audit.

Common Questions

Questions about
this kind of project.

Must the plant replace its PLCs?

Not necessarily. Existing controls may be integrated if suitable protocols, documentation and access are available.

Will monitoring change machine operation?

The proposed starting point is supervisory data collection. Any control changes would require separate engineering review and approval.

Can you promise a specific productivity increase?

No percentage should be promised before the site baseline and improvement opportunities are established.

Keep Reading

More case studies.

All case studies
Get Started

Let’s build Africa’s
smart future together.

Rising energy costs, water scarcity, and tightening ESG mandates demand a partner who has solved these challenges before.

Chat with us